C7AI - Approve La Gorce Water/sewer Design
View full title
A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING ENGINEERING AND CONSULTING SERVICES FOR THE LA GORCE AND LAKEVIEW WATER & SEWER IMPROVEMENTS PROJECT, PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) 2022-122-ND FOR ENGINEERING SERVICES FOR WATER AND WASTEWATER SYSTEM PROJECTS BETWEEN THE CITY AND CHA CONSULTING, INC. (FORMERLY KNOWN AS A&P CONSULTING TRANSPORTATION ENGINEERS CORP.); AND FURTHER, AUTHORIZING A SERVICE ORDER FOR THE FOLLOWING ENGINEERING AND CONSULTING SERVICES REQUIRED TO COMPLETE THE DESIGN AND POST-DESIGN SERVICES FOR SAID PROJECT, FOR A TOTAL PROJECT COST NOT TO EXCEED THE AMOUNT OF $2,361,425.83: (1) DESIGN OF NEW SANITARY SEWER SYSTEMS, WATER DISTRIBUTION SYSTEMS, AND A FORCE MAIN CONNECTING TO FUTURE SANITARY SEWER PUMP STATION 16 IN THE AMOUNT NOT TO EXCEED $1,747,950.84 BY CHA CONSULTING, INC.; (2) SPECIALIZED ENVIRONMENTAL ASSESSMENTS IN THE AMOUNT NOT TO EXCEED $42,407.18 BY NOVA CONSULTING, INC., AS A SUBCONTRACTOR; (3) TOPOGRAPHIC SURVEY SERVICES AND AERIAL LIDAR MAPPING IN THE AMOUNT NOT TO EXCEED $312,505.86 BY WGI, INC., AS A SUBCONTRACTOR; (4) GEOTECHNICAL INVESTIGATION AND REPORTING IN THE AMOUNT NOT TO EXCEED $30,293.46 BY GEOSOL, INC., AS A SUBCONTRACTOR; (5) SUBSURFACE UTILITY ENGINEERING SERVICES (INCLUDING THIRTY SOFT DIGS) IN THE AMOUNT NOT TO EXCEED $28,499.79 BY LONGITUDE SURVEYORS, LLC, AS A SUBCONTRACTOR; AND (6) ENGINEERING DESIGN SUPPORT SERVICES FOR THE WATER DISTRIBUTION SYSTEM COMPONENT IN THE AMOUNT NOT TO EXCEED $199,768.70 BY DELTA CONSULTING, INC., AS A SUBCONTRACTOR. ย
Sponsors
Detailed Information
Cached: 4 minutes agoResolutions - C7 AI
C7 AI A RESOLUTION OF THE MAYOR AND CITY COMMISSION OF THE CITY OF MIAMI BEACH, FLORIDA, APPROVING ENGINEERING AND CONSULTING SERVICES FOR THE LA GORCE AND LAKEVIEW WATER & SEWER IMPROVEMENTS PROJECT, PURSUANT TO REQUEST FOR QUALIFICATIONS (RFQ) 2022-122-ND FOR ENGINEERING SERVICES FOR WATER AND WASTEWATER SYSTEM PROJECTS BETWEEN THE CITY AND CHA CONSULTING, INC. (FORMERLY KNOWN AS A&P CONSULTING TRANSPORTATION ENGINEERS CORP.); AND FURTHER, AUTHORIZING A SERVICE ORDER FOR THE FOLLOWING ENGINEERING AND CONSULTING SERVICES REQUIRED TO COMPLETE THE DESIGN AND POST-DESIGN SERVICES FOR SAID PROJECT, FOR A TOTAL PROJECT COST NOT TO EXCEED THE AMOUNT OF $2,361,425.83: (1) DESIGN OF NEW SANITARY SEWER SYSTEMS, WATER DISTRIBUTION SYSTEMS, AND A FORCE MAIN CONNECTING TO FUTURE SANITARY SEWER PUMP STATION 16 IN THE AMOUNT NOT TO EXCEED $1,747,950.84 BY CHA CONSULTING, INC.; (2) SPECIALIZED ENVIRONMENTAL ASSESSMENTS IN THE AMOUNT NOT TO EXCEED $42,407.18 BY NOVA CONSULTING, INC., AS A SUBCONTRACTOR; (3) TOPOGRAPHIC SURVEY SERVICES AND AERIAL LIDAR MAPPING IN THE AMOUNT NOT TO EXCEED $312,505.86 BY WGI, INC., AS A SUBCONTRACTOR; (4) GEOTECHNICAL INVESTIGATION AND REPORTING IN THE AMOUNT NOT TO EXCEED $30,293.46 BY GEOSOL, INC., AS A SUBCONTRACTOR; (5) SUBSURFACE UTILITY ENGINEERING SERVICES (INCLUDING THIRTY SOFT DIGS) IN THE AMOUNT NOT TO EXCEED $28,499.79 BY LONGITUDE SURVEYORS, LLC, AS A SUBCONTRACTOR; AND (6) ENGINEERING DESIGN SUPPORT SERVICES FOR THE WATER DISTRIBUTION SYSTEM COMPONENT IN THE AMOUNT NOT TO EXCEED $199,768.70 BY DELTA CONSULTING, INC., AS A SUBCONTRACTOR. Applicable Area:
COMMISSION MEMORANDUM
RECOMMENDATION
The Administration recommends approving the Resolution.
BACKGROUND/HISTORY
On June 22, 2022, the Mayor and City Commission (โCity Commissionโ) authorized the Administration to enter into negotiations with Hazen and Sawyer, P.C. (โHazenโ) and A&P Consulting Transportation Engineers Corp. (โA&Pโ) pursuant to Request for Proposals (RFQ) No. 2022-122-ND for Engineering Services for Water and Wastewater Projects.
On February 8, 2023, the City and A&P entered into an agreement (the โAgreementโ) having an initial term of three (3) years, with two (2) one-year renewal terms.
On April 28, 2023, the City Commission approved a request for approval of routine renewals, service orders, change orders, or contract amendments for City-awarded contracts, including the assignment of the Agreement from A&P to CHA Consulting, Inc. (โCHAโ), following acquisition of
A&P by CHA in February 2021, thereby assigning the rights, titles, interests, and obligations of A&P pursuant to the Agreement to CHA.
The subject service order involves the design, permitting, and post-design services necessary for a new sanitary sewer gravity main and a new water distribution system in the La Gorce and Lakeview neighborhoods, along with a new sanitary sewer force main to connect to the future Sanitary Sewer Pump Station 16 (โSSPS 16โ)
The La Gorce and Lakeview Water & Sewer Improvements Project (the โProjectโ) is a priority infrastructure initiative aimed at addressing the aging and insufficient utility infrastructure in the La Gorce and Lakeview neighborhoods.
The Project's goal is to design the replacement of outdated sewer infrastructure and relocate it from backyard residential easements to the public right-of-way, ensuring safety, reliability, and reducing the impact on residences during future maintenance and repairs.
The City has conducted several citywide studies to identify necessary improvements throughout its infrastructure. This Project area is recognized in the City of Miami Beach Sewer System Master Plan as project area S-04, evaluated as the highest priority for Gravity Main replacements.
Additionally, the City of Miami Beach Water System Master Plan indicates that the water infrastructure in this area has a high probability of failure (POF), based on a composite score of remaining useful life and historical water break data.
The Sewer Force Main component is essential for the discharge of the future SSPS 16, which will collect Sewer Gravity flows from the Lake View Subdivision and the south section of North Bay Road in the Project area.
CHA provided a proposal (Attachment A), to conduct data gathering, prepare design drawings, develop specifications, obtain permits, and offer post-design support services in the total not-to- exceed amount of $2,361,425.83, to be completed under Agreement 2022-122-ND for Engineering Services for Water and Wastewater System Projects. Public Works has reviewed the proposal and finds it fair and reasonable.
Upon completion, the Project will enhance water and sewer services in the La Gorce and Lakeview neighborhoods.
This investment will improve system reliability, enhance public health and safety, ensure compatibility with future sewer infrastructure, and support future growth.
Accordingly, the Administration recommends that the Mayor and City Commission authorize the service order for design and post-design services for the Project in the not to exceed amount of $2,361,425.83.
FISCAL IMPACT STATEMENT $2,361,425.83 418-0815-061357-29-418-000-00-00-00-20526 Design-Capital Contracts
The total project budget for design services is $2,361,425.83. This project will provide a cost estimate for the proposed infrastructure improvements throughout the design phase, with construction costs estimated at $21,200,000.00.
This project is funded by the Cityโs Operating Funds for Water & Sewer Capital Projects.
Does this Ordinance require a Business Impact Estimate?
(FOR ORDINANCES ONLY)
If applicable, the Business Impact Estimate (BIE) was published on: See BIE at: https://www.miamibeachfl.gov/city-hall/city-clerk/meeting-notices/
CONCLUSION The Administration recommends approving the Resolution.
Applicable Area
Middle Beach
Is this a โResidents Right to Knowโ item, pursuant to City Code Section 2-17?
Yes
Was this Agenda Item initially requested by a lobbyist which, as defined in Code Sec. 2-481, includes a principal engaged in lobbying? No
If so, specify the name of lobbyist(s) and principal(s):
Department
Public Works
Sponsor(s)
Co-sponsor(s)
Condensed Title
Approve Design Services, La Gorce & Lakeview Water & Sewer Improvements Project. PW